Redlands Metallic Floors Contractor

Step 1

The epoxy adheres best to a surface that is clean. In Redlands, before applying the product on the home floor, we make sure that the surface is not contaminated. Areas with greasy residues and contaminated with oils need chemical cleaning. Redlands homeowners also use shot-blasting to clean, strengthen, and polish the surface. It also allows the epoxy primer to deeply penetrate the floor of your Redlands home so a good mechanical and chemical bond is created. Epoxy priming which is the single most important part of the floor preparation, gives better adhesion of the epoxy product to the floors of your Redlands home, reduces the risk of bubbles and gasses, and gives your new epoxy floor longer life.

Grinding

Before grinding and applying the epoxy on the floor of your Redlands home, be sure to sweep and clean the surface of any oil or grease spots. Grinding opens the pores and lightly textures your Redlands home floor and removes paints and thin coatings from it. Areas that are hard to reach are diamond-ground to correct imperfections and irregularities and to restore the smoothness of your Redlands home floor.

Patching

The floor of your Redlands home can be damaged by harsh conditions and unsuitable materials, abrasions and impact which can result to cracks and holes. Patched these irregularities by using the highest quality polymer-modified patching compound available to epoxy floors. After patching, your Redlands home floor must be grind-smooth before applying the epoxy..

Epoxy Primer

An epoxy primer provides the best possible adhesion of the epoxy to the floor of your Redlands home by penetrating into the concrete for a better chemical bond which results to endurance and durability of your new epoxy floor. Although many contractors and homeowners overlook priming, thinking that it is an added work and additional cost, priming actually results to a better chemical bond with the surface and results to a longer lasting and more durable Redlands epoxy floor.

Step 2

Sweeping and cleaning of the floor

To ensure a successful bonding between the epoxy product and the floor of your Redlands home, properly prepare and clean the surface by dry compressed air or vacuum to remove blast and sanding residues. A brush or broom can also be used if needed. Correct surface preparation ensures a perfect bond between the epoxy product and the surface for a perfect new Redlands epoxy floor.

Epoxy Floor Priming & Filling

Step 3

Prime the floor with a suitable epoxy primer

Prime the floor of your Redlands home to ensure a better bond of the epoxy with the substrate. Priming also reduces chipping or breaking and gives your new epoxy floors longer life. In Redlands, we use a suitable epoxy primer to reduce bubbles especially in thicker coats where air trapped in the concrete slab causes gas bubbles and pinholes to form on the new epoxy floor. Although many feel that it is unnecessary to prime surfaces before the application of the epoxy, priming is an important step that should not be missed.

Step 4

Fill all cracks, holes etc with epoxy grout

Filling small holes and cracks with epoxy grout before priming also ensure a smooth finish of your new Redlands epoxy floor. A diamond cutter is used to slice small cracks to make sure that there is a strong bond between the floor of your Redlands home and grout.

Applying The Epoxy Floor Coating

Step 5

Application of the first coat of epoxy paint

Because improper blending of the two epoxy components results to a gluey, tacky floor and an epoxy floor that will not properly harden, make sure that the entire mixture is properly mixed using an electric mixer and continuously stirred for at least two minutes. Air bubbles should also be prevented from forming on the surface of your Redlands home epoxy floor by making sure that air is not introduced into the mixture. Complete mixing of the two epoxy components result to a nice consistency for a smooth finish of the new epoxy floor in your Redlands home.

Step 6

Apply the product with a roller

When applying the epoxy on the floor of your home in Redlands, do not use cheap rollers as these will only shed, leaving small hairs and shreds of the material on your new epoxy floor finish. When re-coating, do not try to re-use rollers. After applying the first coating of the epoxy, let it dry for about 24 hours or follow label directions. Before applying the next coat, make sure all holes and cracks, as well as minor damages on your Redlands home floor are sealed-filled. Check out for dust, bugs and other debris that may have fallen into the surface.

Last Epoxy Flooring Procedure

Step 7

Apply the final coat

Most epoxy products have a pot life of just about 40 minutes so make sure to mix one bucket and use it immediately on your Redlands home floor. Of course, all dust and other debris that have collected on the surface must be removed before applying the final coat of epoxy as these will only leave imperfections on the final finish of your new epoxy floor.

Professional

Epoxy Flooring

We're not just good

WE'RE THE BEST